Engineering Implementation - design and execution of construction and installation works related to the implementation of the National Programme for Energy Efficiency of Residential Buildings in the Ardino Municipality for the following building: Osetia Residential Building, address 16, Pirin Str. entrance A, B, and C, city of Ardino
Employer: Ardino Municipality
Contractor: PSP EOOD
Started on: January 06, 2016
Completed: March 21, 2016
Total value of the contract: BGN 281 203.93 VAT excluded
Total built-up area of building: 4 101,01 m2
Performance of the contract includes preparation of detailed design for the implementation of energy efficiency measures, carrying out supervision during the execution of construction, execution of works to implement energy efficiency measures. Completed construction activities include: replacement of windows, roof repairs - installation of thermal and humidity insulation and replacement of flashings, gutters and downpipes. Laying insulation system on the exterior walls of the building, laying insulation in an unheated basement, replacing the lighting installation in the common areas of the building with energy saving installation, mounting of a new lightning protection system and refreshing the stairwell of the building.
VIDEO