Construction and installation works under the Yovkov’s Dobrich – Modern Tourist Destination Project
Lot 3 – Museum of Modern and Contemporary History;
Lot 5 – Regional Museum of History, exhibition The Archeology of Dobrudzha
Employer: Dobrich Municipality
Contractor: Consortium Roads Holding – PSP DZZD, leading partner and contractor PSP EOOD
Started on: October 16, 2012
Completed: June 27, 2013
Total value of lot Museum of Modern and Contemporary History: BGN 462 765 VAT excluded
Total value of lot „ Regional Museum of History, exhibition The Archeology of Dobrudzha: BGN 810 504 VAT excluded
The Museum of Modern and Contemporary History in the city of Dobrich is a monument of park art at the Regional History Museum of Dobrich and has the status of immovable cultural value;
Museum of Modern and Contemporary History
Under the assignment the employer, the south facade of the former casino, which had been demolished in the 60s, was restored as per authentic documents from 1932.
The other facades were built up anew. Various amelioration works were performed and installed were the following: external insulation, suspended wall of structural glazing and a black screen behind it, exterior and interior plaster, window frames replacement, interior plasters, screeds and painting. Power supply and electric boards - supply and installation, internal electrical installations, interior and exterior plumbing and sewer systems, installation and commissioning of VRF air conditioning system, delivery and installation of a forced exhaust ventilation, delivery and installation of exhaust ventilation.
Regional Museum of History
Works were performed to set up external insulation, lining the walls from moisture-resistant plasterboard partition walls of plasterboard, internal plastering and painting walls, outdoor triple layer mineral plaster with latex paint, sanding and impregnation of existing windows, glazing with double glazing on existing wooden windows, replacement of flooring with tile , tiles and flooring. Sanding and varnishing of wood flooring. Replacement of waterproofing of the roof, replacement of shingles and roof drainage. Installation of the external power supply, replacement of boards and internal electrical installations, lighting and sockets, replacement of plumbing systems. Delivery, installation and commissioning of VRF air conditioning system, delivery and installation of a forced exhaust ventilation. Repair and reconstruction of toilets for visitors plus building special compartment for people with disabilities. repair and restoration of outdoor courtyard and street access to the museum, landscaping the area around the museum. Construction of relaxation and socializing area with children's playground. Repair of pedestrian passage and installation of outdoor lighting.